Durham College Oshawa, Ontario (East of Toronto)
Durham Campus installed MHD units on their 400 ton cooling tower chiller system, August 17/1999. Scale of approx. 1/8 inches was naturally removed, (approximately 18% of energy cost savings along with no chemical and manual labour cleaning). All done naturally with MHD.  


 

Copyright 2007©